AI-Powered Risk Management
Upload any business document — policy, plan, asset register or operational procedure. AI identifies, rates and structures your risks into a ready-to-use Excel register with inherent and residual scoring, heatmaps and executive summary.
From $249 AUD • Preview free before you pay
Accepts PDF, DOCX, PPTX, or TXT up to 50MB
Drag and drop your document here
or click to browse files
Top Risks Identified (preview)
additional scope-specific risks, controls and treatment actions are included in the full register.
$249 AUD
One-time payment — instant download
Download link emailed to you. Link valid for 7 days.
See the Output
Generated from a real asset management plan — no mock data, no generic templates.
Full risk register with category, description, likelihood × consequence scoring and colour-coded risk ratings.
What You Get
The same structure used by enterprise risk managers — generated from your documents.
Full Risk Register
20–35 risks with category, description, cause, consequence, controls and risk owner.
Risk Scoring
Inherent and residual likelihood × consequence scoring on a 5×5 matrix with colour-coded ratings.
Heatmaps
Visual inherent and residual risk heatmaps on a dedicated dashboard sheet.
Strategic Focus
Dedicated sheet highlighting all High and Extreme residual risks by owner and category.
AI Context Sheet
Detected document type, industry, and source coverage percentage — shows how the AI used your document.
Excel Format
Ready-to-edit .xlsx file. No software install needed — open in Excel, Google Sheets or LibreOffice.
Which Risk Tool Do I Need?
This tool generates a strategic, enterprise-level risk register — the operational, safety, financial and environmental risks facing a business unit, asset class or whole operation, scored and presented for executive and board review. If you need a task-level risk assessment for a specific job — a JSEA, JHA or safe work method statement — use the AI Risk Assessment & JSEA Generator instead.
Built For
Trained on the risk language, categories and controls used in heavy industry — not generic business templates.
Mining
Energy
Utilities
Infrastructure
Manufacturing
Major Projects
Works with your existing operational documents
How It Works
Upload any business document — strategic plan, asset management plan, operational policy, procedure, CAPA, incident report or project scope. PDF, DOCX, PPTX, or TXT.
The AI classifies your document, detects your industry and operational context, and generates a full register with realistic risks specific to your organisation — not generic templates.
Pay once, download instantly. Your Excel file is ready to use, edit and present. Download link emailed to you and active for 7 days.
Related Services
AI Risk Assessment & JSEA Generator
Need a task-level risk assessment instead of an enterprise register? Generate JSEAs, JHAs and safe work method statements for specific jobs and activities.
Learn More →OEM Manual → Work Instructions
Upload Original Equipment Manufacturer (OEM) manuals and automatically extract and convert maintenance procedures into frontline-ready work instructions.
Learn More →AI Training Module Generator
Convert your processes, procedures and work instructions into structured training materials and competency assessments automatically.
Learn More →AI Document Review
Upload existing documentation and receive structured AI analysis, compliance scoring, improvement recommendations and governance insights.
Learn More →