AI-Powered Risk Management

Generate a Complete Strategic Risk Register in Minutes

Upload any business document — policy, plan, asset register or operational procedure. AI identifies, rates and structures your risks into a ready-to-use Excel register with inherent and residual scoring, heatmaps and executive summary.

From $249 AUD • Preview free before you pay

Upload & Preview Free

Upload Your Document

Accepts PDF, DOCX, PPTX, or TXT up to 50MB

Drag and drop your document here

or click to browse files

PDF DOCX PPTX TXT
Analysis Complete

Top Risks Identified (preview)

    additional scope-specific risks, controls and treatment actions are included in the full register.

    $249 AUD

    One-time payment — instant download

    Download link emailed to you. Link valid for 7 days.

    What Your Register Looks Like

    Generated from a real asset management plan — no mock data, no generic templates.

    Example AI-generated risk register showing risk categories, descriptions, inherent and residual scores

    Full risk register with category, description, likelihood × consequence scoring and colour-coded risk ratings.

    A Board-Ready Risk Register in Minutes

    The same structure used by enterprise risk managers — generated from your documents.

    📊

    Full Risk Register

    20–35 risks with category, description, cause, consequence, controls and risk owner.

    🎯

    Risk Scoring

    Inherent and residual likelihood × consequence scoring on a 5×5 matrix with colour-coded ratings.

    🔥

    Heatmaps

    Visual inherent and residual risk heatmaps on a dedicated dashboard sheet.

    Strategic Focus

    Dedicated sheet highlighting all High and Extreme residual risks by owner and category.

    🤖

    AI Context Sheet

    Detected document type, industry, and source coverage percentage — shows how the AI used your document.

    📥

    Excel Format

    Ready-to-edit .xlsx file. No software install needed — open in Excel, Google Sheets or LibreOffice.

    Strategic Risk Register vs. Tactical Risk Assessment (JSEA)

    This tool generates a strategic, enterprise-level risk register — the operational, safety, financial and environmental risks facing a business unit, asset class or whole operation, scored and presented for executive and board review. If you need a task-level risk assessment for a specific job — a JSEA, JHA or safe work method statement — use the AI Risk Assessment & JSEA Generator instead.

    Review required before use: This register is AI-generated from the documents you provide. Executive and risk-owner review and sign-off remains required before it is used for board reporting, insurance, or regulatory purposes.

    Asset-Intensive Industries

    Trained on the risk language, categories and controls used in heavy industry — not generic business templates.

    ⛏️

    Mining

    Energy

    💧

    Utilities

    🏗️

    Infrastructure

    🏭

    Manufacturing

    📐

    Major Projects

    Works with your existing operational documents

    Business Plans Asset Management Plans Project Execution Plans Operational Procedures Compliance Documentation Strategic Plans Safety Management Plans Maintenance Strategies Environmental Plans

    Three Steps to a Complete Risk Register

    1

    Upload Your Document

    Upload any business document — strategic plan, asset management plan, operational policy, procedure, CAPA, incident report or project scope. PDF, DOCX, PPTX, or TXT.

    2

    AI Identifies and Rates Your Risks

    The AI classifies your document, detects your industry and operational context, and generates a full register with realistic risks specific to your organisation — not generic templates.

    3

    Download Your Register

    Pay once, download instantly. Your Excel file is ready to use, edit and present. Download link emailed to you and active for 7 days.

    More AI-Powered Operational Tools

    ⚠️

    AI Risk Assessment & JSEA Generator

    Need a task-level risk assessment instead of an enterprise register? Generate JSEAs, JHAs and safe work method statements for specific jobs and activities.

    Learn More →

    📋

    OEM Manual → Work Instructions

    Upload Original Equipment Manufacturer (OEM) manuals and automatically extract and convert maintenance procedures into frontline-ready work instructions.

    Learn More →

    🎓

    AI Training Module Generator

    Convert your processes, procedures and work instructions into structured training materials and competency assessments automatically.

    Learn More →

    🔍

    AI Document Review

    Upload existing documentation and receive structured AI analysis, compliance scoring, improvement recommendations and governance insights.

    Learn More →

    Need an Ongoing Risk Management Program?

    The Progress Collective builds full risk frameworks, management systems and operational documentation programs for utilities, mining, councils and industrial operations.